|
IMPORTANT NOTE:
The notice below may have expired - To receive our email alerts in the future please click here for a free trial.
|
Procurement Notice Details
Analysis to support implementation of articles 5, 6, 8 and 8c of directive 2014/87/euratom [amendment]
Europe
Purchaser: European Commission-Directorate General for Energy
Website link:
http://www.nuclearmarket.com/proc/msk.cfm?id=79910
22/12/2018 S247 European Commission - Services - Additional information - Open procedure I.II.VI.VII. Luxembourg-Luxembourg: Analysis to support implementation of Articles 5, 6, 8 and 8c of Directive 2014/87/Euratom
2018/S 247-566821
Corrigendum
Notice for changes or additional information
Services
(Supplement to the Official Journal of the European Union, 2018/S 224-511786)
Legal Basis:
Directive 2014/24/EU Section I: Contracting authority/entity
I.1) Name and addresses European Commission-Directorate General for Energy European Commission Directorate General Energy - Directorate D - Nuclear energy, safety and ITER, 1 rue Henri Schnadt, Zone d'activités Cloche d'Or L-2530 Luxembourg Luxembourg 2530 Luxembourg E-mail: ENER-RADPROT@ec.europa.eu NUTS code: LU Internet address(es):
Main address: https://ec.europa.eu/energy/en
Section II: Object
II.1) Scope of the procurement II.1.1) Title: Analysis to support implementation of Articles 5, 6, 8 and 8c of Directive 2014/87/Euratom
Reference number: ENER/D3/2018-168 II.1.2) Main CPV code 79000000 II.1.3) Type of contract Services II.1.4) Short description: Council Directive 2009/71/Euratom as amended by Council Directive 2014/87/Euratom, (the Nuclear Safety Directive, hereafter 'the Directive') significantly strengthens the EU legal framework on nuclear safety. The Directive formulates a common basis for the management of nuclear safety, describing the essential administrative, technical and procedural requirements.The Commission now wishes to broaden its analysis of the implementation of the Directive, focussing on several practical issues, namely; the responsibilities of the Competent Regulatory Authority (CRA) and the Licence Holder. In addition, the Transparency requirements, in which both the CRA and the Licence Holder play an important role, should also be analysed.
Section VI: Complementary information
VI.5) Date of dispatch of this notice: 20/12/2018 VI.6) Original notice reference Notice number in the OJ S: 2018/S 224-511786 Section VII: Changes
VII.1) Information to be changed or added VII.1.2) Text to be corrected in the original notice Section number: II.2.1 Lot No: 1 Instead of: Implementation of requirements on the Competent Regulatory Authority (CRA) and Transparency — Article 5 and Article 8
Lot No: 1
Read: Lot 1 is cancelled
Section number: II.2.6 Lot No: 2 Instead of: Value excluding VAT: 100 000,00 EUR
Read: Value excluding VAT: 200 000,00 EUR
Section number: IV.2.2 Instead of: Date: 07/01/2019 Local time: 16:00 Read: Date: 22/02/2019 Local time: 16:00 Section number: IV.2.7 Instead of: Date: 09/01/2019 Local time: 10:00 Read: Date: 26/02/2019 Local time: 10:00 VII.2) Other additional information: A revised Tender Specifications document will be uploaded in E-Tendering beginning of January 2019
http://ted.europa.eu/, TED database, © European Communities, 1995-2018.
|
|